Login
04 February 2010
BRIDLE ROAD DRAINAGE -UPDATE

The Parish Council have been contacted by the Rights of Way Department who have carried out an inspection of Bridle Road and the Public Bridleway – in particular from the end of the adopted highway to the gate – where surface water has caused significant erosion to the surface.  It is their intention to carry out some surface improvements - this work will include minor excavation to the eroded area and the installation of twin drainage pipe to contain the surface water and channel it into the existing ditch alongside Bridle Road. The area will be covered by 40mm granite scalps that will be compacted to provide a suitable surface for all user groups.

 

The Rights of Way Department also confirm that these improvements will not in any way increase the levels of existing surface water, merely channel it into existing ditches to prevent further erosion.

 

 

Click for Map
Historical MinutesNew pages for 1990-92 added
Hannington LifeDecember issue now available.
Agenda & MinutesDraft 2 Dec minutes - uploaded 3 Dec.
HPC Annual Report2023/24 Annual Report now available
Planning2024/4030 variation of condition 5 DA/2015/0848 - Pastures Farm. Red House Lane
2023/24AccountsDetails of 2023/24 accounts etc uploaded
sitemap | cookie policy | privacy policy | accessibility statement